Understanding CEM IV Concrete

CEM IV cement contains 21-55% pulverised fuel ash (PFA) providing low heat of hydration ideal for mass concrete foundations, dams, and thick sections where thermal cracking presents significant risk. BS EN 197-1 CEM IV/B-V specification permits up to 55% PFA replacement reducing embodied carbon by 40-60% versus CEM I Portland cement.

Slower strength gain requires extended curing periods achieving design strength at 56-90 days versus 28 days for ordinary Portland cement mixes. Excellent sulfate resistance suits aggressive ground conditions including sulfate Class DS-3 and chemical Class XA3 exposure environments common in reclaimed industrial sites.

CEM IV Mix Design Parameters

Typical C25/30 CEM IV concrete uses 280kg/m³ CEM IV cementitious content with 45% PFA replacement yielding 154kg Portland clinker and 126kg PFA. Water/cement ratio limited to 0.50 maximum ensuring adequate durability while maintaining workability through PFA particle fineness effects.

Extended setting time 4-8 hours requires temperature control above 5°C during placement and 7-day minimum moist curing period. Pumpable consistency maintained through S3 slump class with extended workability suitable for large continuous pours exceeding 100m³ daily capacity.

Applications & Advantages

Mass foundations benefit from 20°C lower peak temperature preventing thermal cracking. Strip footings in sulfate-bearing clay soils achieve DC-2z durability without sulfate-resisting cement premium. Agricultural slurry tanks utilise chemical resistance properties extending service life significantly.

Strength Development Profile

7-day strength typically 50-60% of 28-day target increasing to 110% at 90 days due to continued PFA pozzolanic reaction. Early-age loading restricted to 65% design capacity at 7 days, 85% at 28 days ensuring structural safety during construction phases.

Environmental & Cost Benefits

45% PFA replacement reduces CO₂ emissions from 950kg/m³ (CEM I) to 480kg/m³ representing 50% carbon saving. Material cost premium 5-10% versus CEM I offset through sulfate resistance eliminating specialist cement requirements. Availability concentrated around power station regions with bulk transport logistics.

CEM IV Concrete Specifications

CEM IV Type PFA Content CO₂/m³ Strength Gain
CEM IV/A-V 21-35% 720kg 28 days
CEM IV/B-V 36-55% 480kg 56 days
C25/30 Typical 45% PFA 500kg DC-2z sulfate
Mass Foundation 50% PFA 20°C peak Low heat

Essential CEM IV Facts

50% Carbon Reduction

45% PFA replacement cuts embodied COâ‚‚ from 950kg to 480kg per cubic metre concrete.

Low Heat Mass Concrete

20°C peak temperature versus 45°C CEM I preventing thermal cracking in thick sections.

DS-3 Sulfate Resistance

Exceeds DC-2z requirements without sulfate-resisting cement cost premium.

56-Day Design Strength

Extended curing achieves 110% target strength through pozzolanic reaction.

£95-£105/m³ Typical

5-10% premium versus CEM I offset by durability advantages.

BS EN 197-1 Compliant

CEM IV/B-V specification with verified pozzolanic performance data.

Frequently Asked Questions

What is CEM IV cement?

Portland-pozzolana cement with 21-55% PFA providing low heat and sulfate resistance.

Strength gain timeline?

50-60% at 7 days, 85% at 28 days, 110% at 90 days due to pozzolanic reaction.

Suitable applications?

Mass foundations, strip footings in sulfate soils, agricultural tanks, thick slabs.

Carbon footprint benefit?

45% PFA reduces emissions 50% versus CEM I Portland cement mixes.

Minimum curing temperature?

5°C continuous with 7-day moist curing protection essential.

Workability characteristics?

S3 slump maintained 2-3 hours with excellent pumpability through fine PFA particles.

Cost versus CEM I?

5-10% premium offset by sulfate resistance eliminating specialist cement costs.

Availability regions?

Concentrated around former power stations with bulk logistics to nationwide plants.

© 2026 CEM IV Concrete Calculator UK. Based on BS EN 197-1 and BS 8500 specifications.