mixdesigncalc.co.uk

mixdesigncalc

Soakaway Size Calculator UK 2026 | BRE 365 Soakaway Design Tool

Soakaway Size Calculator UK

BRE Digest 365 Soakaway Design Tool – Crate Quantities, Dimensions & Costs. Updated 2026.

⚠️ Important: Soakaway design to BRE Digest 365 requires a site-specific percolation test (soakage test) to determine the soil infiltration rate. The calculator below provides a design estimate based on your entered or assumed infiltration rate. For Building Regulations compliance, always carry out a proper on-site percolation test before constructing a soakaway. In some areas soakaways are not permitted — check with your Local Planning Authority and the Environment Agency.

Calculate Your Soakaway Size – BRE Digest 365 Method 2026

Enter your drainage area, rainfall data, and soil infiltration rate to calculate the required soakaway volume using the BRE Digest 365 design method. Results include crate quantities, excavation dimensions, and a full cost estimate for 2026 UK prices.

Your Soakaway Design Results – BRE Digest 365:

Soakaway Feasibility:
Application & Catchment:
Impermeable catchment area and design parameters
Design Inflow Volume (Vin): m³
Volume of runoff entering the soakaway during the design storm: Vin = catchment area (m²) × rainfall (m/hr) × storm duration (hr)
Outflow During Storm (Vout): m³
Volume lost through infiltration during the storm: Vout = infiltration rate (m/s) × soakaway base area × storm duration (s) × 0.5 (average)
Required Storage Volume (Vstorage): m³
Vin − Vout = the minimum void volume the soakaway must provide to prevent overflow
Total Excavation Volume Required: m³
Storage volume ÷ void ratio of chosen construction type
Suggested Soakaway Dimensions:
One possible configuration; many arrangements are possible. Minimum 5m from any building foundation and 2.5m from any boundary.
Number of Infiltration Crates Required:
Based on standard crate size 1,000mm × 500mm × 400mm (0.2 m³ per crate); check your supplier's actual crate dimensions
Crate Array Configuration:
Suggested crate arrangement; actual layout depends on site dimensions and access constraints
Infiltration Time (to drain fully after storm):
Approximate time for soakaway to fully drain after the design storm; should be well under 24 hours for practical soakaways
Estimated Material Cost (crates + geotextile): £
Based on 2026 average UK infiltration crate prices; excludes delivery, excavation, pipe connections, and inspection chamber
Estimated Installed Cost (supply & install): £
Includes crates, geotextile wrap, pipe inlet, excavation and backfill, and basic installation labour. Excludes VAT and inspection chamber.
⚠️ Key Design Reminders:

How to Size a Soakaway – BRE Digest 365 Method UK 2026

A soakaway is a subsurface structure that receives surface water runoff from roofs, driveways, and other impermeable surfaces and allows it to infiltrate gradually into the surrounding soil. In the UK, soakaways are the standard method of managing surface water drainage from domestic properties where connection to a surface water sewer is not available or not permitted. They are specifically preferred over sewer connection by Building Regulations Approved Document H (Drainage and Waste Disposal) and by Sustainable Drainage Systems (SuDS) policy, which seeks to return surface water to the ground near where it falls rather than discharging it to combined sewers.

The definitive UK design guide for soakaways is BRE Digest 365: Soakaway Design (Building Research Establishment), which provides the standard methodology for sizing soakaways based on the catchment area, design rainfall, and the measured soil infiltration rate. The BRE 365 method requires a site-specific percolation test (soakage test) to determine the soil's actual infiltration rate — this is a simple on-site test involving filling a trial pit with water and measuring how quickly it drains. This measured infiltration rate is then used in the BRE 365 volume calculations to determine the minimum soakaway storage volume required.

In 2026, plastic infiltration crates (also called soakaway crates or storm cells) are the dominant construction method for domestic soakaways in the UK, having largely replaced the traditional rubble-filled pit. Crates offer approximately 95% void ratio (compared with 30–40% for rubble fill), meaning a much smaller excavation is needed for the same storage volume. They are lightweight, easy to handle, structurally robust under traffic loading, and can be configured in almost any shape to fit the available space. A single standard crate (typically 1,000mm × 500mm × 400mm) provides 0.2 m³ of storage volume.

The BRE Digest 365 Design Method – Step by Step

The BRE Digest 365 soakaway design procedure is as follows:

  • Step 1 – Percolation test: Excavate a trial pit approximately 300mm square to the proposed soakaway base depth. Fill with water to a depth of 300mm and allow to drain completely. Refill to 300mm depth three times. On the fourth fill, measure the time (in seconds) for the water level to drop from 75% to 25% of the fill depth (i.e. from 225mm to 75mm). The infiltration rate f = 300mm / (time in seconds × 50) in units of m/s. Repeat the test in at least three locations.
  • Step 2 – Design inflow volume (Vin): Calculate the volume of runoff entering the soakaway during the design storm: Vin = catchment area (m²) × design rainfall intensity (m/hr) × storm duration (hr). Use a 1-hour storm at the local design rainfall intensity as a minimum (50 mm/hr is the standard UK default for most locations).
  • Step 3 – Outflow during storm (Vout): Calculate the volume that drains from the soakaway during the storm: Vout = f (m/s) × soakaway base area (m²) × storm duration (s) × 0.5. The factor 0.5 accounts for the average head over the storm duration. This calculation requires an assumed soakaway plan area — an iterative process is typically used, or a conservative assumption of Vout = 0 (ignoring outflow during the storm) is used for initial sizing.
  • Step 4 – Required storage volume: Vstorage = Vin − Vout. This is the minimum void volume the soakaway must contain to prevent overflow during the design storm.
  • Step 5 – Excavation volume: Total excavation volume = Vstorage ÷ void ratio of fill material (0.95 for crates, 0.30–0.40 for rubble).
  • Step 6 – Check drain-down time: The soakaway must drain completely within a reasonable time after the storm (typically 24 hours). Drain-down time = Vstorage ÷ (f × base area). If drain-down time exceeds 24 hours, the soakaway size must be increased or a different location/construction method used.

When Can You Use a Soakaway?

  • Soil must be suitable: Soakaways require permeable ground — they will not work in heavy clay soil (infiltration rate below approximately 1 × 10⁻⁶ m/s). A percolation test is essential before design. In many UK areas with heavy clay soils, soakaways are simply not viable and surface water must be directed to a watercourse, detention basin, or sewer.
  • Minimum setback distances: A soakaway must be at least 5 metres from any building (to avoid undermining foundations), at least 2.5 metres from any property boundary, and at least 5 metres from any watercourse or highway. Soakaways are not permitted in groundwater source protection zones (check with the Environment Agency).
  • Groundwater depth: The base of the soakaway must be at least 1 metre above the seasonally highest groundwater table. If the water table is too close to the surface, soakaways are not viable.
  • Not for foul drainage: Soakaways are strictly for clean surface water only — roof drainage and clean road/driveway runoff. They must never receive foul water (toilet, kitchen, or bathroom waste). Surface water from areas where vehicles are regularly serviced, washed, or refuelled (oil and fuel contamination risk) should not drain to a soakaway without suitable treatment.

Soakaway Design Reference Tables – UK 2026

Soil Infiltration Rates (f values) by Soil Type

Soil Type Infiltration Rate f (m/s) Approximate BRE 365 Percolation Test Time (300mm drop) Soakaway Viability Notes
Gravel / Clean Coarse Sand10⁻² (0.01)<1 secondExcellentVery large outflow; soakaway may be very small
Coarse Sand10⁻³ (0.001)~1–5 secondsVery goodFast drainage; small soakaway required
Medium Sand / Sandy Loam10⁻⁴ (0.0001)~30–120 secondsGoodMost common UK soakaway-viable soil; standard design
Fine Sand / Silty Sand10⁻⁵ (0.00001)~200–600 secondsMarginalLarger soakaway needed; check drain-down time carefully
Sandy Clay / Silty Loam10⁻⁶ (0.000001)~1,000–3,600 secondsPoorVery large soakaway needed; may not be practical – consider alternatives
Clay / Heavy Clay10⁻⁷ or less>1 hourNot viableSoakaway not recommended; use SuDS, detention, or sewer connection
Chalk / Limestone10⁻³ to 10⁻² (fissured)Varies widelyGood to ExcellentMust test on site; fissured rock can have very high infiltration

Design Rainfall Intensities – UK Regions (1-Hour Duration, 10-Year Return Period)

UK Region Typical 1-hour 10yr Return Period Rainfall (mm/hr) Recommended Design Intensity (mm/hr) Notes
Northern Scotland / Highlands20–3025–30Lower intensity but high frequency
Northern Ireland25–3530–40—
North England (upland)30–4540–50Higher in Pennines and Lake District
North England (lowland) / Midlands35–5050Standard UK design intensity
South England / South East45–6050–60Higher convective storms; 50mm/hr is conservative minimum
East Anglia / East England40–5550—
South West / Wales35–5550Higher totals but often lower intensities than SE
Climate change allowance (+40%)×1.4 of above values70–85Future-proofing for UKCP18 climate projections; LLFA may require this

Soakaway Crate Specifications and Costs – UK 2026

Crate Type Standard Size (mm) Volume per Crate (m³) Void Ratio Load Rating Price per Crate (2026) Notes
Standard soakaway crate1,000 × 500 × 4000.2095%12.5 tonne/m²£18–£35Most common domestic crate; non-trafficked
Heavy duty crate (trafficked)1,000 × 500 × 4000.2090%25–40 tonne/m²£30–£55For use under driveways and trafficked areas
Deep crate / storm cell1,000 × 500 × 6000.3095%12.5 tonne/m²£25–£45Deeper configuration for space-constrained sites
Large storm cell1,200 × 600 × 6000.43295%12.5–25 tonne/m²£40–£70Fewer units needed for large volumes
Modular tank crate800 × 800 × 4000.25696%17.5 tonne/m²£35–£60Stormwater detention / infiltration combined
Perforated concrete ring (600mm dia.)600 dia. × 1,000 deep0.283~85%High£45–£80 per ringTraditional construction; durable; heavy

Typical Soakaway Project Costs – UK 2026

Project Typical Volume (m³) No. of Crates Estimated Installed Cost (SE England) Notes
Small extension / garage roof (30 m²)0.5–1.03–5£800–£1,500Simple dig, 3–5 crates, basic installation
Average house roof (80 m²)1.5–3.08–15£1,500–£3,000Standard domestic soakaway
Large house roof + driveway (150 m²)3.0–5.015–25£2,500–£4,500Combined roof and driveway drainage
Commercial / industrial roof (500 m²)8–2040–100£6,000–£18,000Multiple soakaways or large crate array; engineer design required
Rubble-filled pit (small domestic)2.0 m³ excavation—£600–£1,200Traditional method; larger excavation for same storage

Essential Facts About Soakaways – UK 2026

BRE Digest 365 – The UK Standard

All UK soakaway designs for domestic and light commercial properties should follow BRE Digest 365: Soakaway Design. This methodology requires a site-specific percolation test to measure the soil infiltration rate (f-value), which is then used to calculate the required soakaway volume based on design rainfall and catchment area. Building Regulations Approved Document H references the BRE 365 method as the standard design approach.

The Percolation Test

A BRE 365 percolation test involves excavating a 300mm square test pit to the proposed soakaway depth, filling it with water, and measuring the time for the water to drop from 75% to 25% of the fill depth. This is repeated at least three times and in at least three locations. The infiltration rate f = 0.3m / (measured time in seconds × (225-75)/300). Never design a soakaway without carrying out this test — assuming the infiltration rate without testing is the most common cause of soakaway failure.

Minimum Setback Distances

Building Regulations Approved Document H requires that soakaways are positioned: at least 5 metres from any building or structure (to prevent foundation undermining); at least 2.5 metres from any property boundary; and not under driveways unless specifically designed for trafficked loading. For contamination risk, soakaways should be at least 50 metres from any borehole or abstraction point used for drinking water supply.

Crates vs Rubble Fill

Plastic infiltration crates (95% void ratio) are approximately 3× more volume-efficient than rubble fill (30–35% void ratio) — meaning a much smaller excavation is needed. A 1.0 m³ storage requirement needs only 1.05 m³ of crate excavation but 3.0+ m³ of rubble-filled pit. Crates are also easier to install, maintain, and inspect. The only advantage of rubble fill is lower material cost — but this is usually offset by the larger excavation cost.

SuDS and Planning Policy

Since 2015, Schedule 3 of the Flood and Water Management Act 2010 has been in effect in Wales, making SuDS approval mandatory for most new developments. In England, planning policy (NPPF) strongly encourages SuDS — the Local Lead Flood Authority (LLFA) is a statutory consultee for major developments. Soakaways are one of the simplest SuDS techniques. For new residential developments (10+ units) in England, SuDS compliance is effectively mandatory as part of the planning process.

Climate Change Allowance

LLFA and Environment Agency guidance increasingly requires that soakaway designs include a climate change allowance of +20–40% on design rainfall intensity to account for projected increases in rainfall intensity due to climate change (per UKCP18 projections). Many local authorities require this for all new drainage designs. Adding a 40% climate change uplift to a 50mm/hr design storm gives an effective design intensity of 70mm/hr — significantly increasing the required soakaway volume.

Geotextile Wrapping

Soakaway crate arrays must be completely wrapped in a permeable geotextile membrane to prevent soil particles from migrating into the crates and reducing the void space and infiltration surface over time. The geotextile allows water to pass freely but retains soil fines. A minimum 150gsm non-woven geotextile is typically specified. The geotextile wrap must be continuous with no gaps — any soil ingress will progressively block the soakaway. Inspection chambers with sump chambers help trap sediment before it enters the crate array.

Inspection and Maintenance

Soakaways should include an inspection chamber (rodding eye or access manhole) at the inlet to allow periodic inspection, rodding, and cleaning. Over time, silt accumulates in the soakaway and reduces its effectiveness. A pre-treatment chamber (silt trap) at the inlet significantly extends the soakaway's service life by capturing sediment before it enters the crate array. Annual inspection of the inspection chamber and silt trap is recommended; the soakaway itself should be inspected every 5–10 years.

Not Suitable for All Areas

Soakaways cannot be used in: areas with heavy clay soil (infiltration rate below ~10⁻⁶ m/s); areas where the seasonal high groundwater table is within 1 metre of the proposed soakaway base; Source Protection Zones (SPZ) for groundwater abstractions; areas of known contaminated land; or where slopes or unstable ground create a risk of slope instability. In these situations, alternative SuDS (detention basins, permeable paving, green roofs) or connection to a surface water sewer or watercourse must be considered.

Building Regulations and Planning

Soakaway installation for drainage from a new dwelling or extension is covered by Building Regulations Approved Document H. Building Control must be notified and will inspect the soakaway installation. A drainage plan showing the soakaway location, size, and connection to the property must be submitted. Planning permission is not generally required for a soakaway as permitted development, but the LLFA should be consulted for larger or more complex drainage schemes.

Typical Soakaway Sizes

As a rough guide for planning purposes: a standard UK detached house with approximately 80 m² of roof area in medium sand soil (f = 10⁻⁴ m/s) at 50mm/hr design rainfall typically requires a soakaway of approximately 1.5–3.0 m³ storage volume, achieved with 8–15 standard crates. A single car driveway (20 m²) requires approximately 0.5–1.0 m³ (3–5 crates). Always calculate specifically for your site conditions.

Downpipe Connection

The soakaway is typically connected to roof downpipes via an underground drainage run in 110mm perforated or solid UPVC pipe (to BS EN 1401). A trapped gully at the downpipe base prevents odours and captures leaves before they enter the drainage system. The pipe should fall at a minimum gradient of 1:40 (25mm fall per metre) towards the soakaway. Where the pipe run exceeds 6m, an inspection chamber or rodding eye should be included at the midpoint for maintenance access.

Frequently Asked Questions – Soakaways UK 2026

What size soakaway do I need for my house?

Soakaway size depends on three key factors: your roof / catchment area, the design rainfall intensity for your location, and the soil infiltration rate from a percolation test. As a rough guide for a typical UK detached house with 80 m² of roof in medium sand soil (f = 1 × 10⁻⁴ m/s) at 50mm/hr design rainfall and a 2-hour storm duration, the required storage volume is approximately 2.5–4.0 m³ — equivalent to 13–20 standard soakaway crates. Use the soakaway calculator above to calculate the exact size for your specific site conditions. Never size a soakaway without first carrying out a percolation test to determine the actual soil infiltration rate.

How do I carry out a percolation test for a soakaway?

The BRE Digest 365 percolation test procedure is: (1) Excavate a trial pit approximately 300mm square to the proposed soakaway base depth (typically 1.0–1.5m below ground level). (2) Fill the pit with water and allow to drain completely. Repeat twice more to saturate the surrounding soil. (3) On the fourth fill, measure the time in seconds for the water level to fall from 225mm (75% of 300mm) to 75mm (25% of 300mm). (4) Calculate the infiltration rate: f = 0.15 / (measured time in seconds) m/s (where 0.15m = the 150mm drop). (5) Repeat the test in at least two more locations and use the geometric mean of the results. If f < approximately 1 × 10⁻⁶ m/s, a soakaway is unlikely to be viable and alternative drainage options should be considered.

How many soakaway crates do I need?

To calculate the number of soakaway crates needed: (1) Calculate the required storage volume using the BRE 365 method (use the calculator above). (2) Divide the storage volume by the void volume per crate. For a standard crate (1,000 × 500 × 400mm = 0.2 m³ total volume × 95% void ratio = 0.19 m³ effective storage per crate): Number of crates = storage volume (m³) ÷ 0.19. Round up to a whole number. For example, a 2.5 m³ storage requirement: 2.5 ÷ 0.19 = 13.2 → 14 crates. Always add a margin — if the calculation gives a non-round number, go to the next complete layer arrangement rather than cutting crates.

Can I put a soakaway under a driveway?

Yes — soakaway crates can be installed under driveways, provided you use heavy-duty trafficked crates with a load rating appropriate for the expected vehicle loading. Standard domestic soakaway crates (12.5 tonne/m² rating) are suitable for cars and light vans. Heavy-duty crates (25–40 tonne/m²) are required under driveways with HGV access. The crates must be installed at a minimum depth of 300mm (measured from the underside of the paving to the top of the crate) to provide adequate load distribution, and the paving must be designed to spread loads appropriately. Always use purpose-designed trafficked soakaway crates — standard domestic crates will collapse under vehicle loading.

Does a soakaway need planning permission?

In most cases, installing a soakaway as part of the drainage from a new dwelling extension or to replace an existing drainage arrangement is permitted development — no planning permission is required. However, Building Regulations approval is required — you must notify Building Control before installation, and the soakaway design must comply with Approved Document H. For new dwellings and major developments, the Local Lead Flood Authority (LLFA) is a statutory consultee for drainage. In some special areas (Source Protection Zones, areas of high flood risk, or sites with environmental designations), additional consents from the Environment Agency may be needed. Always confirm with your local authority before commencing drainage works.

How deep should a soakaway be?

There is no single mandatory depth for a soakaway — the depth is determined by the required storage volume, the available plan area, the soil infiltration rate at depth, and the minimum setback from groundwater. However, practical guidelines are: minimum depth 1.0 metre below ground level to avoid frost effects on soil infiltration; maximum depth governed by groundwater — the base of the soakaway must be at least 1 metre above the seasonally highest groundwater table; and optimum depth for UK domestic soakaways is typically 1.0–1.5 metres to the base of the crate array. Deeper soakaways can achieve the same volume in a smaller plan area, but excavation costs increase and access becomes more difficult. For crate-based soakaways, a practical maximum depth is approximately 2.5–3.0m without specialist excavation equipment.

What is the minimum distance from a soakaway to a house?

Building Regulations Approved Document H requires soakaways to be located at least 5 metres from any building or structure. This setback is required to prevent the saturated zone created around the soakaway from undermining building foundations — particularly important in cohesive soils (clay, silt) that lose strength when wetted. Additional setback requirements include: at least 2.5 metres from any property boundary (to prevent saturating a neighbour's ground); at least 5 metres from any watercourse or highway; and at least 50 metres from any borehole or water abstraction point used for drinking water. Check these minimum distances carefully against your site plan before committing to a soakaway location.

Why is my soakaway not working?

The most common causes of soakaway failure are: incorrect soil type — a soakaway installed in clay soil (without a percolation test) will never drain adequately; insufficient size — many older soakaways were sized by rule of thumb rather than calculation, resulting in overflow during heavy rain; silt ingress — soil particles have entered the crates or rubble fill over time, reducing the void space and blocking the infiltration surfaces; root ingress — tree or shrub roots growing into the soakaway; high groundwater table — seasonal groundwater rise filling the soakaway from below; and no geotextile protection — older rubble-filled soakaways without geotextile wrapping invariably silt up over 10–20 years. A blocked or undersized soakaway can sometimes be rehabilitated by jetting and vacuuming the inlet and chambers; severe siltation of the crates or rubble fill typically requires replacement.

How much does a soakaway cost to install in the UK in 2026?

Soakaway installation costs in the UK in 2026 depend heavily on the size required, the soil conditions (which affect excavation difficulty), and the depth. As a guide for South East England: a small soakaway for a garage or extension roof (0.5–1.0 m³, 3–5 crates) costs approximately £800–£1,500 installed; a standard domestic house soakaway (1.5–3.0 m³, 8–15 crates) costs approximately £1,500–£3,000; and a larger combined roof and driveway soakaway (3–5 m³) costs approximately £2,500–£4,500. These prices include excavation, crates, geotextile, pipe inlet connection, and reinstatement of the surface. Excavation in difficult ground (rock, tree roots, services) adds significantly to cost. Deduct 10–18% for North England; add 15–25% for London. Always get at least three quotes from drainage contractors with soakaway experience.

Can a soakaway accept water from a driveway?

Yes — soakaways can receive runoff from driveways and hardstandings, but with an important caveat for areas where vehicles are regularly washed, refuelled, or serviced. Clean driveway runoff (rain draining from a normal residential driveway used only for vehicle parking) can drain directly to a soakaway. However, if the driveway is regularly used for vehicle washing with detergents, or if oil or fuel spillages are possible (e.g. a petrol forecourt, commercial vehicle park, or workshop yard), the runoff must be passed through a Class 1 petrol/oil interceptor (to BS EN 858) before reaching the soakaway, to prevent hydrocarbon contamination of groundwater. The Environment Agency has guidance on drainage from vehicle washing and refuelling areas.

Do I need a soakaway or can I connect to the sewer?

The choice between a soakaway and sewer connection is governed by Building Regulations Approved Document H, which establishes a preference hierarchy: (1) soakaway / infiltration (preferred — returns water to ground); (2) discharge to watercourse (second preference); (3) discharge to surface water sewer (third preference); (4) discharge to combined sewer (last resort — only with water company consent). You should not connect to the combined sewer if a soakaway is viable on your site, as this contributes to sewer flooding and combined sewage overflows. Water companies increasingly refuse new surface water connections to combined sewers. However, if your soil is not suitable for a soakaway (heavy clay, high groundwater), sewer connection or an alternative SuDS solution is necessary. Always check with your local water company about the available drainage options for your specific site.